Quiet period
Construction sites can be disruptive to the local community for long periods of time.
Generally, the hours during which construction sites are allowed to operate is determined by the local authority, in accordance with the Control of Pollution Act, and conditions can be applied to planning permissions in accordance with the Town and Country Planning Act.
Requirements may be set out in a code of construction practice (CoCP), attached to the planning permission for a development. This may define the permitted hours of working, and may also prescribe quiet periods, during which certain activities may not be allowed, such as:
- Use of cutting power tools.
- Breaking or dismantling using power tools, machines or plant.
- Use of impact fasteners.
- Loading heavy materials.
- Other noisy activities considered unacceptable by Environmental Health Officers.
[edit] Related articles on Designing Buildings
- BREEAM Considerate Construction.
- Clerk of works.
- Code of construction practice.
- Complaining about construction sites.
- Considerate Contractors.
- Construction dust.
- Damage caused by construction works.
- Nuisance.
- Planning obligation.
- Planning permission.
- Pollution.
- Quiet area.
- Site rules.
- What hours are construction sites allowed to operate?
- Working day.
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.